The origins of the railway
The line from Noyelles to Saint-Valery
The first railway serving the Baie de Somme was the line from Amiens to Boulogne opened in 1848. In those days, at high tide, the sea reached the foot of the railway embankment between Port-le-Grand and Noyelles-sur-Mer. This line became part of the Compagnie du Nord’s network in 1851.
Very soon, the construction of a standard gauge branch line from Noyelles to Saint Valery sur Somme was envisaged, to serve the harbour whose activity was still important, and probably to compete with the Somme canal, completed some 20 years earlier. The idea of a line to Le Crotoy, supported by Abbeville and avoiding interference with the course of the Somme, did not materialize. The principle of a line serving de Saint Valery, suggested by the Compagnie du Nord and supported by Amiens, was finally adopted in 1853.
Two routes were possible for the branch line:
- One heading eastwards and crossing the Bay where it was narrower, between Noyelles and Port le Grand.
- Another that required building a 1300 meter long trestle bridge across the Bay, with embankments on either side of it, allowing for the reclaiming and selling of land.
This second route was chosen, the potential impact on the silting of the Bay having been most probably under-estimated.
The branch line from Noyelles to Saint-Valery was opened on 5th June 1858. The station at Saint-Valery-Canal having been built on reclaimed land, the station building called on a light-weight framework construction with brick infill.
Permission to extend the line as far as the harbour was granted in 1859. A swing bridge carried the track across the canal. Because of the sharp 50 meter radius curves, only horses were permitted to haul the wagons as far as the harbour. Tracks were laid on the quayside in 1863.
The number of passenger trains running on the branch was significant, connections being provided at Noyelles with all mainline trains of the Paris-Boulogne route, even the night train. At Saint Valery, horse-drawn carriages awaited passengers to take them into town or onwards to Cayeux-sur-Mer or Le Tréport. Goods traffic, on the other hand, was disappointing.
The Local Light Railway
While construction of standard gauge (1.435m) lines permitted by the State was justified to connect major cities, serving rural areas required railways that were cheaper to build and to operate. A first Act passed in 1865 differentiated between lines of «intérêt général», of sufficient importance to receive State support, and lines of «intérêt local», supported by the Départements. A later act, passed, in 1880, kick-started the construction of more than 10.000 miles of light railways all over France.
In the Somme, studies relating to such a railway began in 1881.
The concession
Wisely, the Somme Département opted to create a homogeneous network, with identical technical characteristics, and granted an operating concession to the Société Générale des Chemins de Fer Economiques (SE), a large company with links to the Compagnie du Nord.
Studies then began on three groups of lines:.
- The Albert group, where the network’s central works were to be located: Albert – Doullens, Albert – Montdidier – Rollot, Albert – Péronne – Ham and Offoy – Ercheu
- The Amiens group, with one single line from Amiens Saint Roch to Aumale via Beaucamps le Vieux.
- The Bains de Mer group : Noyelles – Le Crotoy, Noyelles - Saint Valery – Cayeux, Abbeville – Dompierre and Noyelles – Forest l’Abbaye.
Between Noyelles and Saint-Valery, the Compagnie du Nord proposed laying the meter gauge track between the standard gauge rails and leasing its unprofitable operation to the SE. The line from Noyelles to Forest l’Abbaye, not foreseen originally, was built by the SE itself to allow for maintenance of the rolling stock at the Saint Valery works and to serve the borough of Nouvion. At Noyelles and Abbeville, the stations were shared with those of the Compagnie du Nord and operated by this company.
Implementation
The SE built the Somme network. The track gauge was one meter, the minimum radius of the curves was 100 meters and the steepest gradients were 20mm per meter. The rails weighed 20 kilograms per meter. The département paid for lighter, 15kg per meter, rail, but the SE preferred to use heavier rail to save on maintenance costs.
There were 3 types of station buildings:
-
The main stations (Le Crotoy, Cayeux) with accommodation for the station-master on the first floor and a semi-detached goods shed.
-
The secondary stations (Lanchères) with a single waiting room for passengers and a semi-detached goods shed.
-
The halts not providing goods services (former station of Saint Valery Ville)
The goods sheds were built with a framework gable to allow for future extension if traffic so required, this happened at Cayeux and Le Crotoy.
The line from Noyelles to Le Crotoy followed the North shore of the Bay, some distance from the dykes. The line from Saint-Valery to Cayeux began by a gradient then descended towards Lanchères before crossing the “Bas-Champs” (land reclaimed from the sea and below sea-level) as far as its terminus. The line to Dompierre originated at the Compagnie du Nord station in Abbeville and followed the standard gauge line to Saint-Pol as far as Porte du Bois, before crossing the Scardon valley and climbing to the Ponthieu plateau. It ran through the forest of Crécy, where Marcheville halt was actually a café-cum-dance hall, before descending towards the Authie valley after having served Crécy-en-Ponthieu. The line was never extended as far as Hesdin, because neighbouring Pas-de-Calais wasn’t interested. Finally, the Forest-l’Abbaye left Noyelles by crossing the Nord mainline via a metal overbridge before serving Nouvion.
Official openings took place as follows:
- Noyelles – Le Crotoy on 1st July 1887.
- Saint Valery – Cayeux on 6th September 1887.
- Abbeville – Dompierre on 19th June 1892.
- Noyelles – Forest l’Abbaye on 24th August 1892.
The life of the railway
Motive power and rolling stock
The locomotives were of the 0-6-2 T type, built by the Compagnie du Nord in its works at La Chapelle or by Société Alsacienne de Constructions Mécaniques (SACM) at Belfort. Engines n° 3519 to 3523 were fitted with a system of double buffers enabling them to also haul standard gauge wagons on the dual gauge section between Noyelles and Saint-Valery. Running repairs were undertaken at Saint- Valery; for major overhauls, engines were taken to the central works at Albert on standard gauge wagons via the Compagnie du Nord.
The passenger carriages were fitted with bogies, with a varnished wooden body and access via end-balconies. There were two main types: third-class only carriages, and others offering all three classes as well as a luggage compartment.
The goods wagons were of three types: flat, open and box van, some had a birdcage lookout for the brake-men as the Somme network, built in a relatively flat area, had no continuous braking system fitted to the trains. Finally, luggage vans and a breakdown crane were also to be found.
Operations and traffic
The lines from Abbeville to Dompierre and from Noyelles to Forest-l’Abbaye had 3 daily mixed train services, the minimum imposed by the Département. In the summer months, however, the lines serving the Bay were much busier, with six daily trains from Noyelles to Le Crotoy and from Saint-Valery to Cayeux, and 11 between Noyelles and Saint-Valery. Some trains were mixed (passengers and goods), some trains were passenger-only (a very rare occurrence on light railways), and trains of standard gauge goods wagons also ran on the dual-gauge section. The journey times were 17 minutes from Noyelles to Le Crotoy and 46 minutes from Noyelles to Cayeux.
Passengers were mainly local inhabitants travelling to Abbeville, in particular to the market, or to Amiens. In the other direction, from Paris or northern France, a great many tourists changed trains at Noyelles to continue their journey as far as the seaside resorts of the Bay, which expanded quickly thanks to the railway. Families often spent the whole summer there, the menfolk joining them at weekends. The Friday evening train from Paris became facetiously known as “the cuckolds’ train”.
Goods traffic was significant. In Cayeux, portable 600mm gauge tracks were used to carry the flint pebbles from the beach to the station. Horses hauled the skips, which were tipped by gravity into the meter gauge goods wagons. Later on, tower-shaped containers were placed on flat wagons to carry the silica powder (also known as cristobalite).
Sugar-beet was collected in the various stations and shipped to the shredding plants in the SE’s open wagons, which were unloaded using high-pressure water hoses. Underground pipelines then carried the beet juice from Crécy to the sugar mill at Abbeville and from Lanchères to the mill at Beauchamps. Locomotives were used for shunting the plants’ private sidings, and one of them, « La SCARPE », has been preserved by the CFBS.
Chicory was loaded at private sidings in Cayeux and Lanchères and shipped to a processing factory located at Saint-Valery-Canal. The halt at Forêt de Crécy – Marcheville saw the shipment of wood and phosphates, while a purpose-built wagon was used to carry shellfish (locally known as “hénons”) from Le Crotoy. Finally, standard gauge wagons served the harbour at Saint Valery.
The trestle bridge
By the early years of the XXth century, the 1300m long trestle bridge that carried the dual gauge line from Noyelles to Saint-Valery across the Somme Bay was distinctly worn. At very high tides, when the wind was blowing from the north-west, the trestle was sometimes submerged. Passengers has to leave the train, get their feet wet and rejoin the train on the far side of the bridge.
In 1907, it was decided to replace the trestle by an embankment, rather than repair it. Work was completed in 1911, leading to the reclaiming of a lot more land and to the construction of a new road in 1912.
By isolating the back of the Bay from the sea, and considerably reducing the washout effect of ebbing tides, this embankment further accelerated the natural silting of the estuary.
4 World War I
British Army traffic was very important throughout the War: troops, casualties treated in the hotels at Cayeux and supplies unloaded on the harbour at Saint-Valery.
In the spring of 1918, the German offensive in Picardy brought the stations of Amiens and Longueau under enemy fire. To ensure safety for military transport, General Foch ordered the construction of a strategic line from Ponthoile on the Amiens – Boulogne line to Feuquières – Broquier on the Beauvais – Le Tréport route. The line was built in just over 100 days.
Known as the «100 day line», it shared the trackbed of the Bains de Mer network from the Noyelles station throat to just before Saint-Valery Canal works. Completed in August 1918, it actually saw very little use because by that time, the front had moved away from Amiens and the great Allied offensive that led to the Armistice was already under way. The line was lifted in 1919.
Decline
Between the Wars
The Great War had caused major damage to the Albert network located in the east of the Somme. To replace the stock destroyed by the fighting, a large order was placed with the Belgian industry, working from French drawings. 11 locomotives were built at Haine-Saint-Pierre, while 18 teak-bodied carriages, as well as vans and goods wagons, were built in Manage.
Post-war upheaval, inflation, the 1929 economic crisis an above all the onset of competition from lorries and buses led from the early 1930s to the closure of many light railways. In the Somme, however, where population was dense and agriculture prosperous, the Département opted to ambitiously modernize the secondary network.
Twelve railbuses fitted with 85hp motors were ordered from the De Dion – Bouton company and put into service in 1936/37. These slightly Spartan machines were 4-wheelers and fitted with only one driving cab. This meant they had to be turned at the end of each line. Another De Dion railcar, longer and fitted with bogies and two driving cabs, was delivered in 1940. Besides being more comfortable, these modern railcars were considerably cheaper to run and led to much improved journey times: a trip from Noyelles to Le Crotoy now took only 11 minutes, and 27 minutes from Noyelles to Cayeux.
The old Compagnie du Nord station at Saint Valery-Canal, in poor condition and located some distance from the town center, was demolished in 1937, while the halt at Saint-Valery-Ville was rebuilt and extended in a “seaside” style very popular in the 1930s. A fine-looking project was studied for Cayeux, but did not materialize because of WWII.
The replacement of Compagnie du Nord by the nationalized SNCF on 1st January 1938 brought no changes in the management of the joint stations of Abbeville and Noyelles. However, the line from Noyelles to Forest-l’Abbaye was closed to passenger service on 7th November the same year.
World War II
With the rationing of fuel caused by the outbreak of war, this line was promptly re-opened. The fighting in May 1940 led to the destruction of the bridge over the Somme at Abbeville. The Germans then lifted the meter gauge track between the SNCF station and the esplanade on Boulevard Vauban, where a station was installed for transshipping materials for the Plessiel airfield. The latter was connected to the network by a dedicated siding.
The railway was subjected to many attacks. The stations at Plessiel and Forêt de Crécy – Marcheville were destroyed, and 9 people were killed in an air attack at Forest l’Abbaye station in 1943.
The Bains de Mer network was actively involved in the construction of the Atlantic Wall. Materials arrived in standard gauge wagons at Saint-Valery-Canal before being transferred into those of the SE by staff working compulsorily for the Todt Organization.
The latter had track laid on the road from Lanchères to Ault and brought locomotives from other railways.
In May 1944, a fire at Saint-Valery Canal works destroyed two railcars and a locomotive. When the Germans retreated on 1st September, they blew up the swing bridge at Saint Valery. The swing deck fell into the canal, effectively blocking road, rail and waterway traffic (the lifting bridge located further upstream had been destroyed in 1940). Reconstruction of the swing bridge and of the railway works was completed in 1947.
The post-war years: worries and hope
To facilitate the shipment of flint pebbles, the towns of Cayeux et Lanchères repeatedly asked, from 1911 to 1963, for the line to be converted to standard gauge, and extended to Le Hourdel. None of these requests were successful.
On 10th March 1947, the Abbeville – Dompierre line was closed to passenger services and the Abbeville Porte du Bois – Canchy section was lifted. A skimpy passenger service was maintained between Noyelles, Forest l’Abbaye and Crécy, ending in 1951. The closure of the Crécy sugar-beet shredding plant in 1956 led to the closure of the Forest l’Abbaye – Crécy – Dompierre stretch.
Menawhile, however, the Département had decided to close the remainder of the SE Somme network in 1948 – 1949, but to modernize what was left of the “Sea Bathers’ Railway”. The track on the line to Cayeux was renewed with heavier rail from the former Woincourt-Ault standard gauge line. More comfortable and sturdier railcars were bought second-hand from the Anvin – Calais and Flanders networks in 1957, and from the Hermes-Beaumont line in 1959. Unfortunately, the bogie railcar that had been put into service in 1940, and which had just been renovated, was destroyed when the shed at Cayeux caught fire in 1958.
To reduce running costs, it was decided to replace the steam locomotives, some of which were almost 70 years old. Modern and sturdy Diesel engines were bought from the Flanders network in 1957 and from the Ardennes system in 1960. All this stock had been built by the VFIL (1) works in Lumbres (Pas de Calais) in 1936 (railcars) and in 1948 and 1951 for the diesel locomotives.
The steam locomotives whistled for the last time in the autumn of 1957. They were scrapped in 1961 and 1962.
Standard gauge wagons had been hauled on the dual gauge section for a long time using a wagon fitted with a double buffer system. In the early 1960s, the SE became the CFTA (2). The diesel locomotives and the passenger carriages were repainted in the red and cream, the same colour as the railcars.
The end of the public service
In 1965, the closure of the Lanchères shredding plant led to the end of sugar-beet traffic on the line from Noyelles to Forest-l’Abbaye and Canchy, and to the lifting of the track in 1967.
The construction of a new road between Noyelles and Le Crotoy was going to lead to the closure of the railway line to Le Crotoy. Protests by local inhabitants led to the postponement of such closure until 31st December 1969, the pretext being the need to rebuild the bridge over the Maye drainage canal.
At the beginning of the 1970s, the last line to remain in service was therefore Noyelles to Cayeux. A last-minute attempt at modernization was made by renovating one of the railcars bought in 1959 and buying a large De Dion - Bouton railcar from the Réseau Breton network which had just closed. Unfortunately, road transport took over the haulage of flint pebbles. This meant that the railway had lost its main category of goods traffic, while competition from road transport also grew for passenger services.
On 31st December 1972, the last railcar returned to Saint Valery works, ending 85 years of operations on the “Bains de Mer” network.
Fortunately, however, this did not mean that the railway would vanish from the Somme Bay. From the beginning of 1973, the standard gauge goods service to Saint-Valery-Canal station was taken over by the SNCF, ending on 6th February 1989. And the meter gauge lines from Noyelles to Le Crotoy and from Saint-Valery to Cayeux were re-born to become one of the leading heritage railways in France, and possibly even in Europe: the Chemin de Fer de la Baie de Somme, thanks to a group of pioneer enthusiasts who created a preservation society, the «Association du Chemin de Fer de la Baie de Somme».
To follow: History of the Association
(1) VFIL: Voies Ferrées d’Intérêt Local company